product id: 101042
•5.7kW 3 phase 120V output Local Metered Power Distribution Unit / PDU
•Set of 3 built-in current meters continuously report load current per phase
•Attached NEMA L21-20P 20A (3P+N+E) 208V 3 phase input plug with 6 ft. / 1.8m cord
•0U, 70 in. / 178cm vertical form factor supports installation in 2 or 4 post equipment racks
•42 total outlets arranged in three single phase output load banks
•NEMA 5-15/20R outlets output 120V
•Included cord retention brackets keep vital network equipment plugged in and continuously powered
• Toolless mounting supported in button-mount compatible racks, plus nut-and-bolt mounting brackets for other mounting applications (set of 2 9mm buttons pre-installed, 2 9mm and 4 6mm spare buttons included)
•Compliant with the Federal Trade Agreements Act (TAA) for GSA Schedule purchases
Includes | |
Length | |
Type | |
Note | |
Warranty Information |
Why Buy from InstruHub: